Taking shape outside Ballarat on the Yarrowee River is the new 2 lane, 3-span bridge with soil retaining walls, constructed by our highly experienced Ace Infrastructure team. The 33 no. pre-stressed planks measured 11 & 14 metres long and weighed on average 11 tonne. They were lifted into place with a 250T mobile crane and...Continue Reading